Skip navigation

 

Pirdop

View on Cumerio's plant in Bulgary

Cumerio Med in Pirdop transforms concentrates with 25 -35 % copper content into anodes (99% Cu). The annual smelting capacity is around 240,000 tons. Part of the anodes is transported by train to the Cumerio plant in Olen, Belgium as feed for the electrolytic refinery. Cumerio Med also produces 60,000 tons of copper cathodes for the regional markets.

Cumerio Med

BG - 2070 Pirdop, Bulgaria

Tel: +359-728-6 22 16
Fax: +359-728-6 26 46

How to reach the plant:
Access route

Open or download the access route (PDF)

Contact :

Tel: +359-728-62250
Fax: +359-728-62646
E-mail: draga.sapundjieva@cumerio.com
Assistant to the Managing Director

Registered Office

Broekstraat 31 Rue du Marais
B-1000 - Brussels
Belgium

Tel. +32 2 227 12 22
Fax. +32 2 227 12 01

Commercial services

How to access:

Avellino
Brussels
Olen
Pirdop
Yverdon-les-Bains

Document last modified: Mon, 23 Apr 2007